Construction in Progress Setup Checklist
The following table illustrates the system and capital asset card setup that is required for construction in progress capital assets:
Information | Screens | Comments |
Accounting | FA Posting Group | Setup a FA posting group for CIP assets. |
Basic General Information | Fixed Asset Setup FA Classes FA Subclasses |
Setup the Asset Management FastTab. Setup a FA class for CIP assets,and link it to FA Class Type "Project". Create 3 CIP Subclasses: CIP, Preacquisition, Preconstruction . |
Capital Assets | Fixed Assets | Class = CIP Subclass - assign one of the 3 CIP related codes:
|